Via Circular Urbana

Póvoa do Varzim

Client: Município da Póvoa do Varzim

 

Location: Ligação à Rua Manuel Gomes Moreira

 

Implemention Time: 420 days

 

Project Year: 2023

 

What we did:

  • - Preparatory work and demolitions;
  • - Earthworks;
  • - Road infrastructures;
  • - Stormwater drainage;
  • - Stability;
  • - Electrical Infrastructures;
  • - Dismantling of the construction site.
Via Circular Urbana 0
Via Circular Urbana 1
Via Circular Urbana 2
Via Circular Urbana 4
Via Circular Urbana 5
What have we done
  • Preparatory work and demoitions;
  • Erathworks;
  • Road infrastructures;
  • Stormwater drainage.
Share this project:
Via Circular Urbana José André Street Viaduct: An Urban Engineering Marvel A Strategic Street Linkage with Design and Construction Challenges
The connecting road extends for 496.326 meters, from the intersection with José André Street to Manuel Gomes Ferreira Street. It consists of two straight alignments connected by a circular curve with a radius of 300 meters. It includes the crossing of a viaduct over the existing water lines.