Nó de Ermida e de Fontiscos

Santo Tirso

 

Client: Infraestrutruas de Portugal, Lda.

 

Location: Santo Tirso (N104)

 

Implemention Time: 300 dias

 

Project Year: 2022

 

What we did:

  • - Earthworks;
  • - Demolition and Milling;
  • - Drainage, including hydraulic passages, longitudinal drainage structures (ditches, gutters, and drains), complementary drainage structures (manholes, sumps, and dissipating basins);
  • - Pavement, including granular layers, hot mix asphalt layers, granite cubes, and concrete slabs;
  • - Landscaping integration works;
  • - Containment works (tiebacks and reinforced concrete walls);
  • - Telecommunications infrastructure;
  • - Public lighting networks;
  • - Signaling and safety equipment (vertical signage, road markings, demarcation equipment, and safety barriers).
 
 
 
 
Nó de Ermida e de Fontiscos 8
Nó de Ermida e de Fontiscos 3
Nó de Ermida e de Fontiscos 4
Nó de Ermida e de Fontiscos 5
Nó de Ermida e de Fontiscos 6
Nó de Ermida e de Fontiscos 7
Nó de Ermida e de Fontiscos 8
Nó de Ermida e de Fontiscos 1
What have we done
  • Earthworks and Land Preparation;
  • Pavement and Advanced Drainage;
  • Landscape Integration and Containment Works;
  • Installation of Complementary Infrastructur
Share this project:
Nó de Ermida e de Fontiscos Improvement of Accessibility and Safety Transformation of Access and Circulation from A3 Junction to Fontiscos and Ermida Industrial Area
The intervention aims to improve accessibility, circulation, and safety conditions of the current connection between the A3 junction and the industrial area of Fontiscos and Ermida, including the transformation of the current access points at the Fontiscos junction into a level roundabout, and the transformation of the current intersection of branches to the north of the mentioned junction into a roundabout at the Ermida junction.